NPI 技術主管 (課/理級)
  1. AE

1. Auto-equipment, and production line arrangement, design and integration with PD Leader for bellowing tasks 1) Lead team member for NPI working item 2) Equipment design schedule tracking, 3) discussion with CEI/MERD, 4) review supplier DFM, setup, dry run data collection and review UPH/speed/stop line rate with vendor 5) set up checking , include layout and construction 6) reporting, Regular meeting join and total ownership

2. Free flow tasks 1). Free flow design and integration with PD with current FMS system and build up it from PCP to VN (from NPI to MP) 2). Free flow DFM review and setup, dry run data collection and review UPH/speed/stop line rate with vendor 3). Free flow all related activity, DOEs, dry run status update, issue analysis and upload docs to drive 4). All free flow relate stuff follow up, ex the progress on the free flow, layout and construction 5). Regular meeting join and total ownership

 

  1. PE(EE)
  1. 新產品導入試產階段、與R&D合作生產、System組裝等問題之故障分析,及失效分析。
  2. 產測程式與治工具準備。
  3. 新產品試產報告撰寫與分析。
  4. 量產品良率維護與提升以及生產異常處理
  5. 生產異常分析與排除
  6. 量產不良率追蹤與分析
  7. 製程改善與效率提升

 

  1. PE(ME)

1. 負責新產品試產及導入量產

2. 試產/量產品生產異常分析

3. 製程改善及管理

4. 產品生產技術文件修改

5. 產品組裝(測試)治具的圖面設計、發包製作、導入、維護及改善。

6. 具備2D/3D識圖及繪圖軟體操作能力

7. 須和RD co work 討論和分析issue.

 

  1. TPM

1.issue debug (FATP & REL), and validation result from OPS TPM team

2. communication between factory & RD

3. co-work with MERD & PD for production line issue clarified,

4. DFM Leader for bellowing tasks 1) Lead team member for NPI working item 2) Issue tracking, review and reporting 3) DFM report review and discussion with RD 4) F/R improvement 5) ME Fixture DFM report review and discussion with RD

5. Development of assembly fixture and equipment.

6. IQC spec review in design change.

 

  1. TE

1. co-work with SWTE for FATP/SMT Test function issue clarified,

2. FBU DFM Leader for bellowing tasks 1) Lead team member for NPI working item 2) FBU Setup 3) Issue tracking( co-work with SWTE, TE , MFG, QA), review and reporting 4) R/R improvement

3.Test Issue defect analysis and feedback

4. log catch,

5. SW issue evaluation support and SW debug/test program Development

6. Maintain FBU plan follow up and excusion